Skip to content
Bondin Carter
Bondin Carter · Malta & Gozo

Structured cabling,installed and certified.

Cat6A and fibre networks for offices, hotels and industrial sites. Every link is tested to standard and handed over with the results — so the network you paid for is the network you got.

Copper
Cat6 · Cat6A · Cat7
Fibre
OS2 · OM4
Coverage
Malta & Gozo
A-01  ·  Services

The whole route, not just the cable.

S-01

Structured cabling

Cat6 · Cat6A · Cat7

Permanent-link installation from comms room to outlet. Patch panels dressed, ports labelled to a consistent scheme, and every link certified.

S-02

Fibre optic installation

OS2 · OM4 · splicing

Backbone and riser fibre, fusion spliced and terminated into cassettes. OTDR and insertion-loss results supplied per core.

S-03

Containment & civils

Tray · trunking · ducting

Cable tray, basket, trunking and conduit installed to fill ratio and bend radius. Trenching and ducting where the route runs outside.

S-04

Network equipment supply

Switching · Wi-Fi · racks

Specification, supply and installation of switching, wireless and cabinets — configured, mounted and documented, not just delivered to a loading bay.

S-05

Testing & certification

Permanent link · channel

Certification testing across every installed link, with the full result set handed over as part of the as-built pack.

S-06

Moves, adds & changes

Occupied premises

Additional drops, re-patching and re-labelling in live buildings, scheduled around your operating hours.

A-02  ·  How a job runs
Isometric cutaway of a five-level cable installationA technical drawing showing the cable route through a building: the comms room and rack at ground level, a vertical riser carrying backbone cable up through the structure, tray runs distributing across each floor, and terminated outlets at the end of every run.L01L02L03L04L00
Level 00

Comms room

The cabinet is set, earthed and powered. Patch panels are mounted and numbered before a single cable is pulled.

Level 01

Riser

Backbone fibre and copper run vertically through the riser on dedicated containment, segregated from power.

Level 02

Floor distribution

Tray fans out above the ceiling to each zone. Bend radius and fill ratio are held the whole way — this is what fails a test later.

Level 03

Outlets

Faceplates terminated, labelled to match the panel, and tested. The label on the port matches the label on the panel matches the record.

Level 04

Certification

Every permanent link is tested and the results are handed over. If a link fails, it is re-terminated and re-tested before sign-off.

A-03  ·  Process

Four stages, and you get the paperwork at the end of all of them.

  1. P-01

    Site survey

    We walk the building, agree routes and identify what the drawings do not show.

  2. P-02

    Specification

    Cable class, containment, drop count and outlet positions, written down and priced.

  3. P-03

    Installation

    Containment first, then cable, then termination — scheduled around occupied hours.

  4. P-04

    Handover

    Test results, labelling schedule and as-built record, delivered as a pack.

A-04  ·  Recent work

Projects, photographed on site.

This section holds four to six real installations — the building, the drop count, the cable class, and the test results.

Project 01

awaiting photography & client permission

Project 02

awaiting photography & client permission

Project 03

awaiting photography & client permission

A-05  ·  Site survey

Start with a survey, not a quote.

We walk the building, agree the routes, and identify what the drawings do not show. You get a specification you can compare against anyone else’s — drop count, cable class, containment and timeline, written down.

Telephone
client input required
Email
client input required
Coverage
Malta & Gozo
Q-01
Q-02

Optional, but the fastest way to arrange a time.

Q-03
Q-04

Building type, roughly how many points, and whether it is occupied or a shell. Rough numbers are fine.

Q-05

No obligation. We confirm a time before attending.